On the evening of March 4th Companies 3 & 5 were dispatched to a reported chimney fire at 393 Ratzer Road. Upon arrival it was discovered the fire had spread into the attic and crews stretched lines in to the first and second floors and knocked down the bulk of the fire. Crews cut into the roof to vent and found the fire had run the attic. After about half an hour the fire was placed under control.

Tower 3 Ratzer
Tower 3 operating on scene.